Post-flight inspection of the Artemis 1 Orion heat shield showed an unanticipated loss of char layer pieces from the ...
Multiple sources have confirmed that NASA is studying alternatives to the planned Artemis III landing of two astronauts on ...
The Orion spacecraft for Artemis 2 is slated to fly around the moon with four astronauts no earlier than September 2025 — but ...
NASA’s Artemis III lunar landing mission is tentatively scheduled for 2026. The mission will involve a complex operation with ...
That will leave Tiangong as the only government-operated space station in low-Earth orbit. NASA is counting on commercial ...
The Mars Sample Return (MSR), one of NASA’s most critical programs designed to bring pristinely sampled Mars rocks inside 30 ...
A blend of firsts and experience. The Artemis 2 mission crew includes NASA commander Reid Wiseman, NASA pilot Victor Glover, ...
The European Space Agency is moving to the human-in-the-loop stage of its testing procedure for the Moon space station Lunar ...
Catch a last glimpse of Orion and his hunting dogs, track wild ducks, and spot a dumbbell in the sky this week.
One reason cited for the 10-month delay was getting to the bottom of reentry heat shield data from Artemis 1, which sent an uncrewed Orion capsule to lunar orbit and back. Engineers have been ...